A manufacturer closing a list of security fixes
Done, according to the ticket
The challenge. A manufacturer’s IT provider reports that all twelve items from the last assessment are closed. At the next review, two are found only half done: multi-factor sign-in covers the office but not the plant-floor remote tool, and the backup runs but has never been restored.
The insight. A ticket marked closed shows that someone believes the work is done. Quality control means each fix has acceptance criteria written before the work, evidence collected after it, and a person other than the builder who checks.
The decision. The company added an acceptance line to every fix: what will be true, how we will show it, and who will check.
The action. We rewrote the twelve items with acceptance criteria and asked the IT provider to attach evidence for each. We checked the evidence, reopened the two that fell short, and watched a restore from backup end to end. We now use the same rule for our own reports: a second review of facts and wording before they go to a client.
The result. Eleven items passed on evidence and one, the restore, was fixed and re-checked. The company’s record shows who checked what and when.